As of Health & Safety Xpert 2022 v 7.2.446 special field codes can be inserted into documents.
When documents are previewed or published these field codes are transformed into real text.
The sample screenshot below demonstrates using a field code to insert the local HSE Office's address into a document. You can see that when previewing the output that the field code has been transformed into the actual address based on the HSE Office that was selected on the Project Details tab.
Contact information
- {%Client.Address%}
- This will display the client's address as a single line of text or display placeholder text e.g. [Client Address]
- {%Client.Comms%}
- This will display 3 lines of text as shown below. If any of the information is missing the line will still be present.
Tel: 01234 567 890
Mob: 07654 321 000
Email: name@domain.com - {%Client.Company%}
- This will display the company name of the contact
- {%Client.Email%}
- This will display the email address of the contact
- {%Client.Mobile%}
- This will display the mobile number of the contact
- {%Client.Name%}
- This will display the full name of the contact taking into account title, First name, middle name and last name
- {%Client.NameAndCompany%}
- This will display the full name of the contact taking into account title, First name, middle name and last name along with the company name of the contact
- {%Client.Tel%}
- This will display phone number of the contact
As well as using the client the word client can be substituted for the following contacts
- CableWireless- The cable and wireless provider as set up in section 4 of HS00: Construction Phase Plan
- Client - The client as set up on the Project Details tab or in section 4 of HS00: Construction Phase Plan
- Company - The building company as set up on the Project Details tab
- Electricity - The electricity supplier as set up in section 4 of HS00: Construction Phase Plan
- EnvironmentAgency - The relevant regional environment agency as set up in section 4 of HS00: Construction Phase Plan
- Fire - The fire service as set up in section 4 of HS00: Construction Phase Plan
- Gas - The gas supplier as set up in section 4 of HS00: Construction Phase Plan
- HealthAndSafetyDirector - The director responsible for health and safety as set up on the Project Details tab
- Hospital - The relevant regional hospital as set up in section 4 of HS00: Construction Phase Plan
- HSEOffice - The relevant regional HSE office for the project as set up on the Project Details tab
- LocalAutority - The relevant local authority as set up in section 4 of HS00: Construction Phase Plan
- Police - The police service as set up in section 4 of HS00: Construction Phase Plan
- PrincipalContractor - The principal contractor as set up on the Project Details tab or in section 4 of HS00: Construction Phase Plan
- PrincipalDesigne - The principal designer as set up on the Project Details tab or in section 4 of HS00: Construction Phase Plan
- Site - The site as set up on the Project Details tab or in section 4 of HS00: Construction Phase Plan
- Telecoms - The telecoms provider as set up in section 4 of HS00: Construction Phase Plan
- TrafficControl - The relevant regional traffic control for the project as set up in section 4 of HS00: Construction Phase Plan
- Water - The water supplier as set up in section 4 of HS00: Construction Phase Plan
Document lists
- {%Documents.RA*%}
- This will display an ordered list of all Risk Assessments within the project
- {%Documents.CA*%}
- This will display an ordered list of all COSHH Assessments within the project
- {%Documents.TT*%}
- This will display an ordered list of all Toolbox Talks within the project
- {%Documents.MS*%}
- This will display an ordered list of all Method Statements within the project
Project
- {%JobName%}
- This will display the name of the project, as set on the Project Details tab of the software
- {%JobRef%}
- This will display the reference of the project, as set on the Project Details tab of the software
Other
- {%Date%}
- This will display the current date